Monday 15 April 2019

Major Project: Call Sheets

Major Project: Call Sheets

As part of my role as producer on this project, I made a call sheet and schedule for every single shoot (as well as a number of risk assessments). There were far too many to be able to fit into this blog post, but they can instead all be viewed through the below link, along with some risk assessments and consent forms.

https://drive.google.com/open?id=1MP6c9nsqd4kHqnrKIzYxvWs9kM4s7RgK

https://drive.google.com/open?id=1EiUJwzYvD1ueaorYK8CkH31_1wZZT5NI


Test Shoots/Edits
Also on the links below, you can view the output from some of the test shoots and test edits, which I organised/created near the start of this project, to help prepare us for some of our scenes.

https://youtu.be/l8EeUjD0Sew
https://youtu.be/0Nz6nyjEtO8
https://youtu.be/0bOOWtgF3-M
https://youtu.be/vyu0Eg3rU7s
https://youtu.be/teRAIMB4etk

No comments:

Post a Comment