Commission: Shoot Schedule And Equipment List
After meeting and continuing to email the guildhall we have agreed on a some shoot days and deadlines. Following on from this I prepared a basic shoot schedule and list of equipment I will need.
Guildhall Commission Timetable
21st November- Main Shoot day
22nd/23rd November- Additional Shoot days (if required)
24th November- Rough Cut Viewing
4th December- Additional Filming Day (if required)
6th December- Fine Cut Viewing
12th December- Final Deadline.
Shoot Scheduled- Tuesday 21st November
-Arrive about 10AM, meet with Steve to discuss filming locations (that I RECCE'D previously).
-Start with fire pump, move it and equipment outside.
-Decide on best positioning for pump depending on light levels and weather.
-10:30 Set up cameras and other equipment, adjust for light levels etc.
-10:45 Start filming, initial establishing shots of pump.
-11AM Melissa to arrive and help with PTC shots. Start with Tripod then move on to hand held.
-11:15 Review PTC shots then move back to Fire Pump.
-11:30-2:30 Main bulk of filming.
- Follow script/shot list
- Start with Hand Held shots using Fig Rig and Cannon 100D, Cannon M10 on Tripod as secondary camera angle.
- Use Action cam and Dolly for pans.
- Move action Cam to Gorilla pod for POV shots of movement.
- Move Cannon 100D over to tripod for additional pans and focus pulls.
- Finish with establishing shots of museum.
-2:45-3:15 Help Melissa
-3:20 Film outro PTC, Melissa using cannon 100D and Fig rig
-3:30 Review footage.
-3:45 If no further shots are needed consider moving on to Scramasax.
Equipment List
-Cannon 100D (primary Camera)
-Cannon M10 (secondary camera)
-Action Cam (Additional Camera)
-Tripod X2
-Road Mic
-Fig Rig
-Gorilla Pod
-Lighting Kit
-Tascam and Sound Kit
-Clip Board With script and story boards.
-Spare Batteries